telegram华人群(www.tel8.vip)是一个Telegram群组分享平台。telegram华人群包括telegram华人群、telegram群组索引、Telegram群组导航、新加坡telegram群组、telegram中文群组、telegram群组(其他)、Telegram 美国 群组、telegram群组爬虫、电报群 科学上网、小飞机 怎么 加 群、tg群等内容。telegram华人群为广大电报用户提供各种电报群组/电报频道/电报机器人导航服务。
KUALA LUMPUR: HSS Engineers Bhd's unit HSS Integrated Sdn Bhd has been awarded a RM16.6mil variation order (VO) to provide supervising works for Section 9 of the East Coast Rail Link (ECRL) from Serendah to Port Klang.
In a statement, the engineering consultant said the 53.5km section consists of tunnels, viaducts, at-grade sections and stations.
The VO pertains to the letter of appointment HSS Engineers received from China Communications Construction (ECRL) Sdn Bhd in December 2017 to provide supervising consultancy services for infrastructure works from Ch 0+000 to Ch 231+500 for a total contract sum of RM82.5mil.
,,telegram好玩的群组(www.tel8.vip)是一个Telegram群组分享平台,telegram好玩的群组包括telegram好玩的群组、telegram群组索引、Telegram群组导航、新加坡telegram群组、telegram中文群组、telegram群组(其他)、Telegram 美国 群组、telegram群组爬虫、电报群 科学上网、小飞机 怎么 加 群、tg群等内容。telegram好玩的群组为广大电报用户提供各种电报群组/电报频道/电报机器人导航服务。
According to HSS Engineering executive director Sharifah Azlina Raja Kamal Pasmah, overall construction works for the ECRL were well underway with reported progress of 28.57% as at April 2022.
"We are heartened by the opportunity to reprise and even expand our role to carry on the project's momentum, especially in the crucial linkage in the Klang Valley," she said.
The project works are targeted for completion by the fourth quarter of the financial year ended Dec 31, 2027.
With the latest contract win, the group said its unbilled orderbook stands at RM530mil year-to-date, which will provide earnings visibility until 2027.
评论列表 (1条)
2023-05-07 01:10:49
会爆火吗,期待